Construction

Software for contractors and construction operators

Contractors need a job record that survives the site and the office: variations, subcontractors, daily reports, and the cost that is no longer a surprise at the end. We build that operational system rather than a generic task list.

Designed in Dubai and Ajman.

Dubai office

45th Floor, The One Tower, Sheikh Zayed Road, Barsha Heights

Ajman office

26th Floor, Amber Gem Tower, Nuventure Free Zone

Contact

Email, call, or WhatsApp info@raabsoftwares.com

Call
DubaiThe One Tower, Barsha HeightsAjmanAmber Gem TowerOffices

What we build

  • Project cost visibility
  • Subcontractor workflow
  • Site reporting
  • Drawing and document register
Software for contractors and construction operators | Raab Group Software Solutions UAE

Construction

Site and office are one project

A daily report that never reaches the cost code is a diary, not a control. We connect the site capture, often on a phone, to the project and the approval that releases money. Photos and documents stay with the event that produced them.

Site and office are one project - Construction | Raab Group Software Solutions UAE

Construction

Site and office are one project

How we work

    Project cost visibilityCommitments and actuals at a level a project manager can use weekly.
    Subcontractor workflowPackages, certificates, and the documents required before payment.
    Site reportingA phone-friendly report that lands on the job, including photos.
    Drawing and document registerWhich revision is current, and who was told.
    Construction Software Development | Raab Group | Raab Group Software Solutions UAE
    Construction

    In practice

    The project the site can update

    Projects, subcontractors, site reports, and cost visibility.

    A daily report that never reaches the cost code is a diary, not a control. We connect the site capture, often on a phone, to the project and the approval that releases money. Photos and documents stay with the event that produced them.

    View this work
    • The package or the site report
    • Who approves a change
    • Photos and notes the office can find
    • Every subcontractor portal
    • A full cost-control suite
    • BIM as a slogan with no file you use

    On the screen

    What the first release usually is

    One type of project, one reporting loop, and the variation or subcontract approval that currently happens in email. A full estimation suite is a later decision, especially if you already own one that people trust.

    Questions we are often asked

    What the first release usually is - Construction | Raab Group Software Solutions UAE

    Construction

    • Project cost visibility
    • Subcontractor workflow
    • Site reporting
    • Drawing and document register

    In this build

    Construction

    Construction Software Development | Raab Group | Raab Group Software Solutions UAE
    Construction
    • Project cost visibilityCommitments and actuals at a level a project manager can use weekly.
    • Subcontractor workflowPackages, certificates, and the documents required before payment.
    • Site reportingA phone-friendly report that lands on the job, including photos.
    • Drawing and document registerWhich revision is current, and who was told.

    What the first release usually is

    One type of project, one reporting loop, and the variation or subcontract approval that currently happens in email. A full estimation suite is a later decision, especially if you already own one that people trust.

    • Every subcontractor portal
    • A full cost-control suite
    • BIM as a slogan with no file you use
    What the first release usually is - Construction | Raab Group Software Solutions UAE
    What the first release usually is

    Included now

    The project the site can update

    On the first project

    • The package or the site report
    • Who approves a change
    • Photos and notes the office can find

    A programme

    • Every subcontractor portal
    • A full cost-control suite
    • BIM as a slogan with no file you use

    Decide before we start

    What changes construction software

    • T
      The siteIf it needs a desk and a strong signal, the foreman will not open it.
    • T
      The changeA variation needs an owner and a cost effect, or it is only a chat message.
    • T
      The drawingSay which file is current. A folder of versions is not a system.

    Bring this to the call

    What a site brief needs

    T

    The project

    One live job, not the whole portfolio.

    T

    The site

    Signal, dust, and who will actually type.

    T

    The change

    How a variation is approved, and whether cost is in scope.

    T

    The current file

    Which drawing is the one people should open.

    Services

    What we build

    P

    Project cost visibility

    Commitments and actuals at a level a project manager can use weekly.

    S

    Subcontractor workflow

    Packages, certificates, and the documents required before payment.

    S

    Site reporting

    A phone-friendly report that lands on the job, including photos.

    D

    Drawing and document register

    Which revision is current, and who was told.

    Related

    Related reading

    Common questions

    Questions we are often asked

    Can site staff use this with poor signal?

    Yes if we design an offline queue for the reports that matter. See mobile development for how we treat sync.

    Do you build BIM tools?

    We integrate with files and registers. We are not a geometry kernel or a BIM authoring vendor.

    Will this handle retention and variations?

    Yes, when those rules are specified by your commercial team. We implement the workflow they define. We do not replace a quantity surveyor’s judgement.

    Ready to operate

    Marks a job cost is current

    1. 01
      A variation is approvedExtra work is on the job only after the person who may say yes has said it.
    2. 02
      A drawing has a revisionThe site is looking at the revision that was issued, not an older file with the same name.
    3. 03
      An update is datedA progress note says who wrote it and which day it describes.
    4. 04
      Cost sits on the jobLabour, material, and variation land on that project.

    Use this list on the call. Tell us which marks are missing today, and which can wait.

    Two offices

    Dubai and Ajman.

    The One Tower in Barsha Heights, and Amber Gem Tower in Ajman.

    Offices

    Write to us

    Tell us about the work.

    Share the outcome, the deadline, and the constraints. We reply from Dubai or Ajman with a practical way to start, including what should wait.

    Dubai 45th Floor, The One Tower, Sheikh Zayed Road, Barsha Heights
    Ajman 26th Floor, Amber Gem Tower, Nuventure Free Zone